River suburbs

Custom home builder in Applecross

In Applecross, the street often shapes a home as much as the block does. Jacaranda and plane trees line many verges, and the river streets carry larger lots with deeper setbacks. Our in-house design team and interior designers work with you from the first conversation, so the home is planned around how you live and what the site allows. Builds typically start from $1.5M, excluding land.

Applecross has two kinds of house street: R12.5 along the river edges and R15 through the interior grid. At Canning Bridge, an activity centre allows neighbouring buildings of 16 m to 26 m. Below, we explain which code applies where, what the City's change to building height on 18 August 2026 means for a two storey house, and how street trees and the river reserve shape a design.

Exterior of a contemporary Ardross custom home featuring contrasting materials, large windows and modern architectural detailing.

Our homes near Applecross

Our closest work to Applecross is in neighbouring Ardross and Attadale. A little further south-east, we're currently building two homes in Mount Pleasant.

Private tours of selected completed and in-progress homes are available by invitation, subject to availability. Our team can share which homes are currently available to view.

Building in Applecross: what changes

The scheme and the codes. Applecross sits in the City of Melville under Local Planning Scheme No. 6, gazetted on 27 May 2016. Clause 26 modifies the R-Codes only for split-coded lots and clause 36 says the scheme has no special control areas, so a house is designed to the code on the scheme map and the City's policies. On that map the river-facing edges are R12.5: The Strand, Majestic Close, Fraser Road, Tuart Street, Dunvegan Road and Grosse Road to the north, the lots west of Matheson Road, and Duncraig Road, Roskhill Place, Flanagan Road and the Canning Beach Road frontage to the north-east. The interior grid is R15, for example Alness Street, Tain Street, Simpson Street, Kinross Road, Macrae Road and Strome Road. Under the R-Codes an R12.5 lot has a 7.5 m primary street setback, 55% open space and a 17 m minimum frontage, with a minimum site area of 700 m2 and an average of 800 m2; an R15 lot has a 6 m setback, 50% open space and a 12 m frontage, with a minimum of 580 m2 and an average of 666 m2. Public mapping puts about 21.6% of the suburb's area in R15 and 17.3% in R12.5. Higher codes sit around the Ardross Street and Kintail Road village (R40) and along Canning Highway (R60 and R40/60). The code changes from street to street, so check the lot with the City before you buy.

Canning Bridge. The Canning Bridge and Riseley centres are coded R-AC0, about 9.2% of the suburb's area between them. At Canning Bridge the Canning Bridge Activity Centre Plan applies, approved by the WAPC on 18 April 2016, and its Kintail and Ogilvie quarters are the ones inside the City of Melville. At the residential edge of the plan, the H4 zone allows buildings up to 16 m above natural ground level with a minimum 3 m street setback, and the H8 zone allows up to 26 m, held to 20 m within 5 m of a boundary or street where it adjoins or faces an H4 site. Side and rear setbacks in both zones are 3 m. The core zones allow up to 10 and 15 storeys, with bonus height provisions. A lot coded R12.5 or R15 that backs onto or faces the plan area can therefore have a 16 m building, or a stepped 20 m to 26 m building, as a neighbour. On the scheme map the R-AC0 coding reaches roughly Tweeddale Road and Riverway to the north and about Forbes Road to the west, but the plan's zone boundaries need checking street by street, so confirm the lot and the land around it with the City.

Setbacks and the street. Local Planning Policy 3.1 Residential Development (last reviewed 17 May 2022) replaces several R-Codes standards. A garage is set back 4.5 m from the primary street, which can be reduced where the garage sits at least 0.5 m behind the dwelling alignment. The garage door and its supporting structures cannot take up more than 50% of the lot frontage, or up to 60% on a two storey house where the upper floor extends the full width of the garage and the entrance is clearly visible from the street. A front fence must be visually permeable above 1.2 m, to a maximum of 1.8 m to the top of panels and 2.0 m to the top of piers. For the house itself the policy allows the street setback to match the average of the adjacent dwellings, or to be reduced by up to 50% where the building area in the setback is offset by an equal area of open space. The policy was written against an older edition of the R-Codes and has not been updated to match the current one, so confirm how the City applies the street setback to your lot. A crossover needs its own approval from the City, which asks for a minimum of 10 business days; it is 3 m to 6 m wide, or 4.5 m at most where the frontage is 12.5 m or less.

Height. This is the rule that changed most recently. The scheme sets no height limit for the Residential zone, and until this year Local Planning Policy 1.9 Height of Buildings filled the gap: for R12.5 to R40 it allowed 8.0 m to the eaves, a 9.0 m external wall with a concealed roof and 10.5 m overall. Council revoked that policy on 18 August 2026 with immediate effect. Height is now as per R-Codes Volume 1 (Version 3, published 10 April 2026), Table 3, Category B: a 7 m wall, and a total of 8 m for a gable, skillion or concealed roof or 10 m for a hipped and pitched roof. Anything above those figures needs a design principles assessment under clause 5.1.6. We found no height, view corridor or escarpment policy specific to Applecross. Local Planning Policy 1.10 Amenity (last reviewed 17 March 2026) lists access to views of significance among the factors the City may weigh when a proposal needs a performance assessment, and lets the City ask for an Amenity Impact Statement.

Floating timber staircase with glass balustrading and large windows in a contemporary Ardross custom home.
Modern kitchen in an Ardross custom home featuring dark cabinetry, stone island benchtop and open-plan living.

Trees. On private land, the City states that development approval is not currently required to remove a tree. A draft policy would change that, and it is covered under "Rules in motion" below because it is not in force. Street trees are a different matter. The jacaranda and plane trees on Applecross verges are recorded on the City's Local Heritage Survey as Category 2. That is not a Heritage List entry and carries no formal development control, but the trees are City-managed under policy CP-029 Trees on City Managed Land (last reviewed 9 December 2025). The City will not remove a healthy street tree for a crossover where an alternative location exists. If removal is approved, the applicant pays for the removal, two replacement trees and three years of establishment, and a tree that stays needs a Tree Protection Zone to AS 4970. In practice the verge tree often fixes where the crossover, and so the garage, can go.

Heritage. No private house in Applecross appears on the City's Heritage List (Version 5, updated June 2023). The listed places include Heathcote at Point Heathcote, Applecross Primary School at 65 Kintail Road, Applecross District Hall at 2 Kintail Road, the RSL Memorial Hall at 98 Kintail Road, the Raffles Hotel at 70 Canning Highway, Canning Bridge, and Point Dundas with the Majestic Hotel site, boardwalk and Applecross Jetty. Heathcote is the only place the scheme designates as a Heritage Area, and lots on Duncraig Road adjoin it.

River and bushfire. About 9.4% of the suburb's area is in the Swan Canning development control area. On the scheme map most river-side lots are separated from the foreshore reserve by a road, The Strand or Canning Beach Road. Lots at Majestic Close and Point Dundas, and the strip along the western river edge, appear to sit directly against the reserve. Where a lot abuts the control area, the Department of Biodiversity, Conservation and Attractions' Policy 48 (June 2016) asks for a principal setback of 10 m or 20% of the average distance to the opposite boundary, whichever is the lesser, open style fencing no higher than 1.8 m on that boundary, and retaining walls set back at least 3 m, each no more than 1 m high and 3 m in combined height. The department's map shows whether a particular lot abuts the control area, so check it for your lot. About 1.3% of the suburb's area is mapped bushfire prone; check the lot on the DFES map. We did not find flood or coastal hazard mapping on the City's pages, so ask the City about levels if the lot is low and close to the water.

Demolition and knockdown rebuild. Demolition needs a permit (form BA5), which the City decides within 10 working days. Planning approval is not needed unless the property is on the Heritage List. The City takes a $1,900 verge bond for all demolition work, plus a non-refundable inspection fee, and refunds the bond after a Notice of Completion and a passed verge inspection. Building work valued over $20,000 carries its own bond, so the rebuild is bonded separately. Asbestos is removed before demolition, by a licensed contractor where there is 10 m2 or more of asbestos cement sheeting, and the site is to be left clean and tidy within 90 days of the permit. The ABS recorded 53 new house approvals in the Applecross - Ardross statistical area in the 12 months to September 2026, against 41 the year before.

Rules in motion. The WAPC's copy of the Canning Bridge Activity Centre Plan carries an expiry date of 31 January 2027. An updated plan was conditionally approved by the Statutory Planning Committee on 10 June 2026, subject to further work on its community benefits framework that will be released for comment first; the City says the original plan remains in effect until that process is complete. The City is also reviewing Local Planning Scheme No. 6. The latest round of engagement closed on 31 August 2026, a draft scheme is expected in late 2026 and the statutory process in 2027. Its June 2026 map of proposed changes shows one site near Canning Beach Road as R30 and several street blocks north of the Riseley centre as R40. These are proposals, no final decision has been made, and the map does not label streets. Draft Local Planning Policy 1.24 Regulated Trees on Private Land was advertised from 31 August to 31 October 2026 and has not been adopted. If adopted as drafted, damaging a tree that is 8 m or more high, has an average canopy diameter of at least 6 m, or has a trunk circumference of at least 1.5 m measured 1.4 m above the ground would need development approval, and impact on views would not be accepted as a reason. Amendments to Policy 3.1, advertised in 2025, would return the street and garage setbacks to the R-Codes and add a height clause for sloping sites; Council referred them back to committee on 9 December 2025 and we found no adoption. With reviews under way, the rules will change. Check the current codes for your lot with the City of Melville, or ask us, before you buy or begin design.

Applecross at a glance

MeasureFigureAs atSource
New houses approved, 12 months53in the Applecross - Ardross statistical area (41 the year before)October 2025 to September 2026ABS Building Approvals
Residential density codesAbout 21.6%of the suburb area R15, 17.3% R12.5, 9.2% R-AC0Sampled 10 November 2026DPLH via Landgate SLIP
Bushfire-prone mappingAbout 1.3%of the suburb area; check the lotSampled 10 November 2026DFES via Landgate SLIP
Swan Canning development control areaAbout 9.4%of the suburb area, along the riverSampled 10 November 2026DBCA via Landgate SLIP
Separate houses53.9%of private dwellings2021 CensusABS
Population7,2282021 CensusABS

Figures are for the suburb or statistical area named. Area shares are grid estimates from public mapping and are not lot designations.

For current median sale prices, see REIWA's Applecross suburb profile.

What a $1.5M+ build looks like in Applecross

As our cost guide explains, a Trendsetter home is generally $4,000 to $6,000+ per square metre to build. Builds range from $1.5M to $4M, with most between $1.5M and $3M, excluding land.

In Applecross, the code sets the starting point. An R12.5 lot on a river street keeps 55% of the site open behind a 7.5 m street setback; an R15 lot in the grid keeps 50% open behind 6 m. That open space is where the garden, pool and outdoor living go, so we plan it as carefully as the house. Since 18 August 2026, height is the tighter constraint. A two storey house with a concealed roof now has 8 m in total and a 7 m wall, where the revoked policy allowed a 9.0 m wall, so we settle ceiling heights and floor structure in the first sketches to keep the rooms generous. The verge tree usually decides where the crossover and garage go. Near Canning Bridge, we look at what the plan allows next door before placing living areas and windows, so privacy and outlook are protected from the start.

How we work

Trendsetter Homes has designed and built custom homes across Perth since 1997. Design, construction and interiors are handled by one team, so the people who draw your home are the people who build it, and the interior designer is in the room from the first brief. Before you commit, we show you real homes: private tours of finished and in-progress client homes, by invitation, with no obligation. Many clients talk to us before they buy a block, and that is a good time to start.

Nearby suburbs we build in

Ardross, Mount Pleasant, Attadale and Bicton are also in the City of Melville, so the same scheme and policies carry across. Over Canning Bridge, Como is in the City of South Perth, where the rules change.

Nearby: Ardross, Mount Pleasant, Attadale, Como, Bicton.

Elsewhere in the river suburbs: Bull Creek, East Fremantle, Manning, Salter Point, South Perth, Waterford.

All areas: see every suburb we have written up.

Questions about building in Applecross

How high can a new house be in Applecross?

Outside the Canning Bridge and Riseley centres, the R-Codes Table 3 Category B limits apply: a 7 m wall, and a total of 8 m for a gable, skillion or concealed roof or 10 m for a hipped and pitched roof. Until 18 August 2026 the City's Local Planning Policy 1.9 allowed 8.0 m to the eaves, a 9.0 m wall with a concealed roof and 10.5 m overall, but Council revoked it on that date. Anything above the Table 3 figures needs a design principles assessment.

My block is near Canning Bridge. What can be built next to it?

If the neighbouring land is inside the Canning Bridge Activity Centre Plan, the plan's heights apply to it: up to 16 m in the H4 zone and up to 26 m in the H8 zone, stepped to 20 m near an H4 boundary. The plan carries an expiry date of 31 January 2027 and an updated version is conditionally approved, with the original remaining in effect for now. We check the zoning of the surrounding lots with the City before design begins.

Can I remove a tree to fit the house?

On private land, yes for now: the City states that development approval is not currently required to remove a tree. Draft Local Planning Policy 1.24 would require approval for trees 8 m or more high, with a canopy averaging at least 6 m or a trunk circumference of at least 1.5 m, but it has been advertised and not adopted. A street tree on the verge is City-managed under policy CP-029, and the City will not remove a healthy one for a crossover where another location exists.

Does the river setback apply to my lot?

Only if the lot abuts the Swan Canning development control area. Policy 48 then asks for a principal setback of 10 m or 20% of the average distance to the opposite boundary, whichever is the lesser, with open style fencing and limits on retaining. Most Applecross river streets have a road between the lots and the foreshore reserve, so check the department's map for the lot.

Can I subdivide an Applecross block?

It depends on the code and the lot area. Under the R-Codes, R12.5 needs a minimum site area of 700 m2 and an average of 800 m2 per lot, and R15 needs a minimum of 580 m2 and an average of 666 m2, so two lots need about 1,600 m2 at R12.5 or about 1,332 m2 at R15. Below that, the project is one house replacing one house.

Talk to us

Book a design meeting at our Osborne Park office, or request a private tour of a finished or in-progress home. Office (08) 9446 2822. For tours, call Marek on 0412 688 079. Or use the enquiry form below.

Request a design chat

Client reviews

What our clients say

4.4 out of 5 from 34 Google reviews

“From the outset Michael was very clear about their process and costing. … The quality of materials and workmanship are excellent. In addition, there was good communication and any queries we had were responded to quickly. We highly recommend Trendsetter Homes.”
Anita JonesGoogle review, 3 weeks ago
“We can’t praise Michael Agostino and his great team enough for making the journey as drama-free as possible. Michael’s experience, knowledge and attention to detail are outstanding.”
Kevin KeyhaniGoogle review, 5 years ago
“From design with Anthony, he was amazing and hit all of our needs and provided a really good layout that worked well for us. … There was open communication throughout the build which made the build a lot easier.”
Adrian De carolisGoogle review, 4 years ago
“They are great to work with, very professional and attentive to detail. We highly recommend Trendsetter Homes for anyone looking for a builder who build quality homes and is reliable and trustworthy.”
Tim WGoogle review, 2 years ago